EA1 Cable Route Project
- Jun 9
- 1 min read
Updated: 3 days ago
Large-scale works along a 40 km cable route, including herbicide treatment to topsoil storage bunds, hydroseeding, reinstatement and irrigation systems where required.

Project overview
Client: Roadbridge Limited
Location: EA1 cable route
Service: Herbicide treatment, hydroseeding, reinstatement and irrigation
Value: £500k+
Scope of works
Works along a 40 km cable route
300,000 square metres of herbicide treatment to topsoil storage bunds
Hydroseeding along the full 40 km route with bespoke seed mixtures
Seed mixtures used to suppress noxious weed growth and control dust on site
Reinstatement of various areas along the route, including campsites and organic farms
Irrigation systems installed where required during dry periods
Project details
Oliver Brown Ltd delivered works on the EA1 Cable Route Project for Roadbridge Limited. The project covered a 40 km route and included herbicide treatment to topsoil storage bunds, hydroseeding along the full route with bespoke seed mixtures, reinstatement works and irrigation where needed during dry periods.
Outcome
Large-scale vegetation and reinstatement works helped manage noxious weed growth, control dust and support reinstatement across a complex linear project.
Key project information
40 km cable route
300,000 square metres of herbicide treatment
Hydroseeding across the full route
Value £500k+
Planning a similar project? Contact Oliver Brown Ltd to discuss land management, seeding, fencing, ecological contracting or invasive weed works.