top of page

Cottam Power Station Restoration Works

  • Jun 9
  • 1 min read

Updated: 3 days ago


Long-term restoration and annual land management works at Cottam Power Station, including lagoon capping, topsoiling, hydroseeding, conventional seeding, fencing, ditch maintenance and tree establishment.


Project overview

  • Client: Tilhill

  • Period: 2010 to present

  • Location: Cottam Power Station

  • Service: Power station restoration, hydroseeding, seeding, fencing and land management

  • Value: £500k+


Scope of works

  • Capping, topsoiling and hydroseeding/conventional seeding of North and South Lagoons

  • Perimeter fencing, ditch maintenance and gate installation

  • Tree establishment

  • Annual mowing of open spaces

  • Ditch and fence repair

  • Ecological mitigation and land-based maintenance as required


Project details

Oliver Brown Ltd has supported restoration and maintenance works at Cottam Power Station since 2010. The work has included the capping, topsoiling and seeding of the North and South Lagoons, alongside fencing, drainage and tree establishment works. Ongoing works through Tilhill include annual mowing, ditch and fence repairs, ecological mitigation and wider land-based maintenance items as needed.


Outcome

Ongoing management of approximately 120 hectares of land, supporting long-term restoration, access management and ecological requirements across the site.


Key project information

  • 2010 to present

  • Approximately 120 hectares under annual management

  • Value £500k+


Planning a similar project? Contact Oliver Brown Ltd to discuss land management, seeding, fencing, ecological contracting or invasive weed works.

bottom of page