Cottam Power Station Restoration Works
- Jun 9
- 1 min read
Updated: 3 days ago

Long-term restoration and annual land management works at Cottam Power Station, including lagoon capping, topsoiling, hydroseeding, conventional seeding, fencing, ditch maintenance and tree establishment.
Project overview
Client: Tilhill
Period: 2010 to present
Location: Cottam Power Station
Service: Power station restoration, hydroseeding, seeding, fencing and land management
Value: £500k+
Scope of works
Capping, topsoiling and hydroseeding/conventional seeding of North and South Lagoons
Perimeter fencing, ditch maintenance and gate installation
Tree establishment
Annual mowing of open spaces
Ditch and fence repair
Ecological mitigation and land-based maintenance as required
Project details
Oliver Brown Ltd has supported restoration and maintenance works at Cottam Power Station since 2010. The work has included the capping, topsoiling and seeding of the North and South Lagoons, alongside fencing, drainage and tree establishment works. Ongoing works through Tilhill include annual mowing, ditch and fence repairs, ecological mitigation and wider land-based maintenance items as needed.
Outcome
Ongoing management of approximately 120 hectares of land, supporting long-term restoration, access management and ecological requirements across the site.
Key project information
2010 to present
Approximately 120 hectares under annual management
Value £500k+
Planning a similar project? Contact Oliver Brown Ltd to discuss land management, seeding, fencing, ecological contracting or invasive weed works.